检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈家东 CHEN Jia-dong(Hainan Water Conservancy and Hydropower Survey,Design and Research Institute,Haikou 570203,China)
机构地区:[1]海南省水利水电勘测设计研究院,海口570203
出 处:《工程建设与设计》2021年第22期202-204,共3页Construction & Design for Engineering
摘 要:水利水电工程是至关重要的基础设施项目。项目建设过程多采用EPC工程总承包管理模式,有利于提高信息传输效率,加强组织领导。但是,水利水电工程EPC工程总承包管理模式中仍存在一些风险,如法律法规风险、进度风险等,因此,需要加强风险控制管理,保障水利水电工程的顺利实施。论文主要对水利水电工程EPC工程总承包模式中存在的风险进行分析,并提出风险控制管理策略,以供参考。Water conservancy and hydropower projects are crucial infrastructure projects. EPC project general contract management mode is adopted in project construction process, which is beneficial to improve information transmission efficiency and strengthen organizational leadership. However, there are still some risks in the EPC management mode of water conservancy and hydropower projects, such as legal and regulatory risks, schedule risks, etc.. Therefore, it is necessary to strengthen risk control and management to ensure the smooth implementation of water conservancy and hydropower projects. This paper mainly analyzes the risks existing in the general contracting mode of water conservancy and hydropower projects, and puts forward risk control management strategies for reference.
关 键 词:水利水电工程 EPC工程总承包模式 风险控制
分 类 号:TV512[水利工程—水利水电工程] F272.35[经济管理—企业管理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117