既有铁路电气化改造工程环境保护对策  被引量:2

Environmental Protection Countermeasures of Existing Railway Electrification Reconstruction Project

在线阅读下载全文

作  者:杨忠平 YANG Zhongping(Ecology and Environment Design and Research Institute,China Railway First Survey and Design Institute Group Co.,Ltd.,Xi,an Shaanxi 710043,China)

机构地区:[1]中铁第一勘察设计院集团有限公司生态环境设计研究院,陕西西安710043

出  处:《铁路节能环保与安全卫生》2021年第6期29-31,共3页Railway Energy Saving & Environmental Protection & Occupational Safety and Health

摘  要:阐述了既有铁路电气化改造的主要难点,即因建造时间较久远,存在部分区段位于自然保护地范围内、部分桥梁荷载不足、部分车站水处理设备老化等。结合既有铁路电气化改造工程特点,从依法合规优化设计、防治环境污染、预防电磁环境影响等方面分析电气化改造工程环境保护工作重点,并提出对策及建议。There are many difficulties to electrify the existing railways such as some sections are located within the natural reserve,insufficient load on some bridges,some water treatment equipment is ageing because those existing railways are historical.Combining the characteristics of existing railway electrification reconstruction projects,these key points of environmental protection are analyzed from aspects such as optimizing design in accordance with laws and regulations,preventing environmental pollution,and preventing electromagnetic environmental impact and the further countermeasures and suggestions are put forward.

关 键 词:既有铁路 电气化 改造 环境保护 

分 类 号:U227[交通运输工程—道路与铁道工程] X322[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象