检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:尹海彪 Yin Hai-biao
机构地区:[1]中冶南方都市环保工程技术股份有限公司,湖北武汉430205
出 处:《电力系统装备》2021年第23期67-68,共2页Electric Power System Equipment
摘 要:为了满足发电厂孤网运行管理需求,应积极落实更加合理的电网控制策略,提升电厂孤网运行的安全性与可靠性,采取先进工艺落实开发管理方案。分析了孤网总体方案,并从系统组成、生产维修计划模块、发电计划模块、自动发电控制模块、自动电压控制模块等方面阐释了功率电压运行的控制系统,并对稳定控制系统的策略展开讨论。In order to meet the needs of power plant isolated grid operation and management,actively implement more reasonable grid control strategies,improve the safety and reliability of power plant isolated grid operation,and adopt advanced technology to implement development management plans.The article analyzes the overall plan of the isolated grid,and explains the control system of power and voltage operation from the aspects of system composition,production and maintenance planning module,power generation planning module,automatic power generation control module,automatic voltage control module,etc.,and expands the strategy of stable control system discuss.
分 类 号:TM732[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229