检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘虹强[1] 文建华[1] 曾强[1] 袁兆平[1] 陈思尧 杨剑红 朱国宝 陈尚品 LIU Hong-qiang;WEN Jian-hua;ZENG Qiang;YUAN Zhao-ping;CHEN Si-yao;YANG Jian-hong;ZHU Guo-bao;CHEN Shang-pin(Regional Geological Surveying Team,BGEEMRSP,Chengdu 610213)
机构地区:[1]四川省地质矿产勘查开发局区域地质调查队,成都610213
出 处:《四川地质学报》2021年第S01期102-108,共7页Acta Geologica Sichuan
摘 要:新建川藏铁路某长大深埋隧道,工程地质条件复杂,围岩分级,岩爆,大变形,涌突水,瓦斯,地温等主要工程地质问题对铁路选线及施工潜在影响极大。通过对某隧道隧址区地形地貌、地层岩性、地质构造等进行调查,简要分析了该深埋隧道工程主要地质问题围岩失稳、大变形、岩爆、涌突水、可溶岩、瓦斯及有害气体等(杨小军,2017)。针对该工程地质问题进行了简要分析评价。The engineering geological conditions of a deeply buried long tunnel project of the proposed Sichuan-Tibet Railway are complex.Major engineering geological problems such as rock classification,rock burst,strong deformation,water gushing,gas and ground temperature has great influence on line selection and construction of the railway.This paper makes an approach to evaluation of the above-mentioned engineering geological problems.
分 类 号:P642[天文地球—工程地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.60