检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵明 Zhao mMing(The fFifth Pproject Co.,Ltd.of China Railway Bureau 14 Group,jJining shandong 272117,Shandong Province,China)
机构地区:[1]中铁十四局集团第五工程有限公司,山东济宁272117
出 处:《建筑与装饰》2022年第3期123-125,共3页Construction & Decoration
摘 要:本文结合日照疏港铁路跨疏港大道特大桥架梁施工,根据单线简支T梁和架桥机倒装龙门的结构形式、倒装T梁时的受力分析,采取了在T梁上加装架桥机倒装龙门专用底座,再将倒装龙门支立在专用底座上,以便有效地解决长大桥T梁换装这一难题,不仅大大提高了架梁施工效率,而且有效保证了架梁施工安全。本文为类似施工提供了借鉴和参考。Based on the erection construction of Super Large Bridge over Shugang Avenue in Rizhao Shugang railway,the structural form of single-track simple supported t-beam and Gantry Crane t-beam and the analysis of the forces acting on inverted t-beam,a special base for Gantry Crane is installed on t-beam,then Gantry Crane is erected on the special base,so as to effectively solve the problem of t-beam reloading of the long-span bridge,which not only greatly improves the construction efficiency of erecting the beam,but also effectively ensures the construction safety of erecting the beam.This article provides reference for similar construction.
分 类 号:U44[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229