检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:罗振强 LUO Zhen-qiang(The 2nd Engineering Co.,Ltd.of China Railway 17 Bureau Group Corporation,Xi'an 710043,China)
机构地区:[1]中铁十七局第二工程有限公司,西安710043
出 处:《价值工程》2022年第10期13-15,共3页Value Engineering
摘 要:非洲经济基础和技术力量相对薄弱,基础建设十分落后,是中国未来最具潜力的建筑市场。只要在海外开展施工项目,就必须要面对管理机械设施这个重大问题。并以科学的设备管理条件和成本控制,其对施工工期、项目投入技术有严格的限制。Africa's economic foundation and technological strength are relatively weak,and its infrastructure is very backward.It is the most potential construction market in China in the future.As long as construction projects are carried out overseas,the major problem of managing mechanical facilities must be faced.And with scientific equipment management conditions and cost control,it has strict restrictions on the construction period and project investment technology.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.20.240.115