检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Karas Slawomir Gnyp Krzysztof
机构地区:[1]Road and Bridge Department,Lublin University of Technology(LUT),Lublin 20-618,Poland [2]Gnyp Krzysztof,Vbcadprojekt Ltd.,Skrzynice-Kolonia 23-114,Poland
出 处:《Journal of Civil Engineering and Architecture》2022年第1期24-37,共14页土木工程与建筑(英文版)
摘 要:The paper presents the construction of a steel footbridge in the People’s Park in Lublin.The initiation and development of the architectural design of an interesting and,as it eventually turned out,aesthetically pleasing footbridge is discussed.Two teams of architects and bridge engineers worked in parallel on the design.The design process of the footbridge structure is discussed along with its trial installation and on-site construction.The span of the footbridge is short,but its structure is innovative.For this reason its numerical model was developed used as a basis for an analysis of the dynamic response of the designed structure.The basic element of the acceptance procedure was constituted by a dynamic test load and an analysis of the pedestrian footbridge user comfort.Last but not least,the final section reviews the aesthetic canons of bridges and focuses on the footbridge in question in this context.A statistical measure of the aesthetic impression induced by a visit to the footbridge was applied resulting in a predictable and obvious final aesthetical assessment.
关 键 词:FOOTBRIDGE design AESTHETICS of BRIDGES FOOTBRIDGE dynamic test load PEDESTRIAN COMFORT BIM (building information modelling) steel FOOTBRIDGE
分 类 号:TG1[金属学及工艺—金属学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.80