检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙聿卿 郭晓军[2,3] 陈兴长[1] 张菊 SUN Yuqing;GUO Xiaojun;CHEN Xingzhang;ZHANG Ju(School of Environment and Resource,Southwest University of Science and Technology,Mianyang 621000,China;Key Laboratory of Mountain Hazards and Surface Process/Institute of Mountain Hazards and Environment,Chinese Academy of Sciences,Chengdu 610041,China;CAS Center for Excellence in Tibetan Plateau Earth Sciences,Beijing 100101,China)
机构地区:[1]西南科技大学环境与资源学院,四川绵阳621000 [2]中国科学院山地灾害与地表过程重点实验室/中国科学院水利部成都山地灾害与环境研究所,四川成都610041 [3]中国科学院青藏高原地球科学卓越创新中心,北京100101
出 处:《自然灾害学报》2022年第1期226-237,共12页Journal of Natural Disasters
基 金:第二次青藏高原综合科学考察(2019QZKK0902);国家自然科学基金项目(41977257)。
摘 要:2008年汶川地震以来,灾区山洪泥石流等次生灾害频发,山区洪水不仅自身具有极大危害,也是激发泥石流等次生灾害的水源条件。采取科学有效的方法对洪水流量进行估算,对于山洪和泥石流防灾减灾具有重要科学和现实意义。本文选取震区一个具有数年监测历史的小流域(2.4 km2)为研究对象,选取具有代表性的降雨场次,利用SCS产流模型和运动波方程分别进行产流和汇流计算,模拟洪水过程,用实测数据验证该水文模型在研究区的模拟效果。结果表明,该模型可以较好地捕捉峰值流量和峰现时间等关键指标;对于数平方公里尺度的小流域,划分子流域增大了参数选择的难度,对模拟效果并无明显提升;在保持参数一致的情况下,时间步长越短,模拟效果越精确,随着时间步长的增加,峰现时间延迟,洪峰流量减小,径流过程线逐渐坦化,趋于平缓。研究对认识汶川地震灾区小流域产汇流特征和洪水计算方法有一定的科学意义。Mountainous hazards such as floods and debris flows have occurred frequently in the Wenchuan Earthquake area since 2008. Flash floods not only cause great harm by themselves,but also act as the triggering factors that stimulate the debris flows. Using scientific and effective methods to estimate flood discharge is of great scientific and practical significance for the hazards prevention and reduction. In this work,a small watershed(2.4 km2)with a monitoring history of several years in the earthquake area is selected as the research object. SCS runoff model and the Kinematic wave equation we combined to simulate the runoff of 5 rainfall events between 2014 and 2016.The results show that the model can simulate the key indicators including peak discharge and the occurrence time of peak discharge. It is also found that for small watersheds,dividing sub-watersheds increases the difficulty of parameter selection,and does not significantly improve the simulation results. In addition,the time of peak discharge is delayed,the peak discharge is reduced,with the increase of the time step. The research is of scientific significance for understanding the hydrological characteristics,and flood discharge calculation in small watersheds in the Wenchuan earthquake-stricken area.
关 键 词:峰值流量 峰现时间 SCS模型 运动波方程 汶川地震灾区
分 类 号:X43[环境科学与工程—灾害防治] P694[天文地球—地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.147