检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李鹏亮 Li Pengliang(Huangshan Coal Co.,Ltd.an Coal Division Jinneng Holding Coal Group,Changzhi Shanxi 046000)
机构地区:[1]晋能控股煤业集团潞安煤炭事业部黄山煤业有限公司,山西长治046000
出 处:《机械管理开发》2022年第4期155-157,共3页Mechanical Management and Development
摘 要:为解决煤矿生产中传统排水泵长时间运行导致的效率低、电费较高的问题,对煤矿排水泵关键参数进行分析,基于“避峰填谷”原则完成了灰色预测模型和预测控制模型的设计,实现了排水泵合理用电策略功能。通过实践应用,验证了合理用电策略预测模型和控制模型的准确性,证实了“避峰填谷”的用电策略可达到降低电费的目的,提高煤矿生产的安全性。In order to solve the problems of low efficiency and high electricity cost caused by the long operation of traditional drainage pump in coal mine production,the key parameters of coal mine drainage pump are analyzed,and the grey prediction model and prediction control model are designed based on the principle of "avoiding peaks and filling valleys" to realize the function of reasonable power consumption strategy of drainage pump.The accuracy of the prediction model and control model of the rational power consumption strategy was verified,and it was confirmed that the "peak avoidance and valley filling" power consumption strategy can reduce the electricity cost and improve the safety of coal mine production.
分 类 号:TD744[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.58.133.140