检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙绍志 朱文灿 SUN Shao-zhi;ZHU Wen-can(Yunnan Huadian Ludila Hydropower Co.,Ltd.,Dali 671611,China)
机构地区:[1]云南华电鲁地拉水电有限公司,云南大理671611
出 处:《云南水力发电》2022年第8期203-205,共3页Yunnan Water Power
摘 要:围绕解决同一门机上抓梁和抓斗切换的繁琐导致工作效率低下的问题,通过对抓梁和抓斗工作原理和工作方式的研究,在保证设备使用功能的前提下,采用将抓梁和抓斗进行一体化设计,减少设备切换时拆除动滑轮轴的工序,能极大地提升工作效率,有效降低了传输电缆水下泄露的机率,为电站的稳定运行提供强有力的保障。The purpose of this paper is to solve the problem of inefficiency caused by tedious switching between beam and grapple on the same gantry crane.The working principle and mode of beam and grapple are studied.On the premise of guaranteeing the function of equipment,the integrated design of beam and grapple is adopted to reduce the work of removing the movable pulley shaft during equipment switching.It can greatly improve work efficiency,effectively reduce the probability of underwater leakage of transmission cable,and provide strong guarantee for stable operation of power plant.
分 类 号:TV732.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.79