检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李科军 邓旻涯 黄文静 张宇 曾家旺 陈淼林 LI Ke-jun;DENG Min-ya;HUANG Wen-jing;ZHANG Yu;ZENG Jia-wang;CHEN Miao-lin(School of Materials Science and Engineering,Central South University of Forestry and Technology,Changsha 410000,China;Hunan Changyuan Yuecheng Machinery Co.,Ltd.,Changsha 410000,China)
机构地区:[1]中南林业科技大学材料科学与工程学院,湖南长沙410000 [2]湖南长院悦诚装备有限公司,湖南长沙410000
出 处:《工程设计学报》2022年第4期519-526,共8页Chinese Journal of Engineering Design
基 金:国家自然科学基金资助项目(51805555)。
摘 要:为了深入了解混凝土湿喷机摆动系统的工作特性,根据摆动系统的结构及工作原理,考虑液压元件内部阀芯等零部件的运动响应时间等因素,建立了摆动系统的键合图模型和动力学方程,仿真分析了在摆臂摆动过程中恒压泵、蓄能器和电液换向阀等液压元件的工作特性,并搭建了摆臂摆动测试平台进行实验验证。研究结果表明:在摆臂运动达到稳定状态之前,恒压泵斜盘处于最大倾角状态,泵出高压油液用于左右摆动缸的运动和蓄能器充液,蓄能器气室压力随着摆臂摆动次数的增加而逐渐升高,并最终稳定在14 MPa;在摆臂运动达到稳定状态之后,恒压泵斜盘倾角在0°~19°之间周期性变化,蓄能器放液最大瞬时流量达到322.5 L/min,可实现S形分配阀在0.24 s内完成换向;摆动缸无杆腔工作压力的测试结果与仿真结果基本一致,验证了所建模型的准确性。研究结果为进一步优化混凝土湿喷机摆动系统提供了参考。In order to deeply understand the working characteristics of the swing system of concrete wet spraying machine, according to the structure and working principle of the swing system, the bond graph model and dynamic equation of the swing system were established by taking into account the motion response time of components such as the internal valve core of hydraulic element. The working characteristics of hydraulic components such as constant pressure pump, accumulator and electrohydraulic directional valve were simulated and analyzed in the process of swing arm movement, and a swing arm swing test platform was built for experimental verification. The research results showed that the swash plate of constant pressure pump was in a maximum inclination angle state before swing arm movement reached a stable state. The high-pressure oil pumped out was used for the movement of left and right swing cylinders and the charging of the accumulator. The pressure of the accumulator gas chamber gradually increased with the increase of swing times of swing arm and finally stabilized at 14 MPa;after the swing arm movement reached a stable state, the inclination angle of the swash plate of the constant pressure pump changed periodically at 0°-19°, and the maximum instantaneous flow of the accumulator discharge reached 322.5 L/min, and the S-shaped distribution valve could realize the reversing within 0.24 s;the test results of the working pressure of the rodless cavity of swing cylinder were basically consistent with the simulation results, which verified the accuracy of the established model. The research results provide a reference for the further optimization of the swing system of wet shotcrete machine.
关 键 词:混凝土湿喷机 摆动系统 键合图 动力学建模 仿真
分 类 号:TH137.5[机械工程—机械制造及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.48