检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:钟勇明[1] 朱红华[1] 黄智敏[1] ZHONG Yongming;ZHU Honghua;HUANG Zhimin(Guangdong Research Institute of Water Resources and Hydropower,Guangzhou 510635,China)
出 处:《广东水利水电》2022年第9期16-21,共6页Guangdong Water Resources and Hydropower
摘 要:通过溢洪道水工模型试验,研究优化布置对溢洪道水力特性的影响。经过多方案比选,试验对进水渠导墙布置形式以及墙身结构进行优化,可扩大进水面、减小导墙进口内、外侧水位差、改善进水渠内水流流态,从而提高了溢洪道泄流能力;通过增加外凸式阶梯陡槽段、降低消力池尾坎高程等措施,可增加下游消能效果,优化出池流态,可为类似工程提供借鉴。Through the hydraulic model test of the spillway,the influence of the optimal layout on the hydraulic characteristics of the spillway is studied.Through the comparison and selection of several schemes,the test optimizes the layout type of the guide wall of the intake channel and the structure of the wall body,which can expand the intake surface,reduce the water level difference inside and outside the inlet of the guide wall,and improve the flow pattern in the intake channel,so as to improve the discharge capacity of the spillway;by increasing the convex stepped chute section and reducing the elevation of the tail sill of the stilling basin,the downstream energy dissipation effect can be increased and the flow pattern of the stilling basin can be optimized.The test results can be used as a reference for the design and operation of similar projects.
分 类 号:TV651.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117