基于组合赋权云模型的阻力伞保障风险评估  被引量:8

Risk Assessment of Resistance Umbrella Support Based on Combined Weighted Cloud Model

在线阅读下载全文

作  者:谷雨轩 徐常凯[1] 倪彬 GU Yu-xuan;XU Chang-kai;NI Bin(Department of Material and Four Station,Air Force Logistics College,Xuzhou 221000,China)

机构地区:[1]空军勤务学院航材四站系,徐州221000

出  处:《科学技术与工程》2022年第24期10787-10795,共9页Science Technology and Engineering

摘  要:针对阻力伞保障风险指标体系不完善、风险管理不系统的问题,通过工作分解结构(work breakdown structure, WBS)-资源分解结构(resource breakdown structure, RBS)法兼顾工作流程和风险要素,建立清晰完善的阻力伞保障风险指标体系。采用组合赋权法融合不确定层次分析法(analytic hierarchy process, AHP)-集对分析的主观权重和CRITIC法(criteria importance though intercriteria correlation)的客观权重实现对风险指标的合理赋权,建立基于云模型的风险评估模型确定风险等级,引入雷达图直观地展示和等级并进行风险分析。研究结果对于实施风险控制、提升保障效率和确保飞行安全具有重要意义。Aiming at the problems of imperfect resistance parachute support risk index system and unsystematic risk management, a clear and perfect resistance parachute support risk index system was established by taking into account workflow and risk elements through work breakdown structure(WBS)-resource breakdown structure(RBS) method. The combination weighting method was used to integrate the subjective weight of uncertain analytic hierarchy process(AHP) set pair analysis and the objective weight of criteria importance though intercriteria correlation(CRITIC) method to realize the reasonable weighting of risk indicators, a risk assessment model was established based on cloud model to determine the risk level, and the radar chart was introduced to intuitively display and grade and conduct risk analysis. The research results are of great significance for implementing risk control, improving support efficiency and ensuring flight safety.

关 键 词:阻力伞保障 风险评估 工作分解结构-资源分解结构(WBS-RBS)法 组合赋权 云模型 

分 类 号:V267[航空宇航科学与技术—航空宇航制造工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象