检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:侯金锁 王冠 陈玮 赵洁 Hou Jinsuo;Wang Guan;Chen Wei;Zhao Jie(Shanghai Energy Technology Development Co.,Ltd.,Shanghai 200233,China)
出 处:《可再生能源》2022年第10期1340-1345,共6页Renewable Energy Resources
基 金:国家科技支撑计划课题(2015BAA06B00);国家重点研发计划项目(2018YFB1501104);上海张江国家自主创新示范区专项发展资金项目(201701-MH-CHJ-C2092-012)。
摘 要:为了验证WindCube激光雷达在不同地形和不同测量高度条件下替代测风塔评估风资源的可行性,文章采用WindCube激光雷达与测风塔在复杂山地、平原和沿海3种地形条件下的同步观测试验数据,对风速、风向、相对偏差和风廓线进行了对比分析。对比结果表明:WindCube测量高度越高,有效数据完整率越低,在90~120 m轮毂高度,有效数据完整率在90%以上,能满足风能资源评估要求;在复杂山地、平坦地形条件下,WindCube与测风塔风速相关系数达0.99以上,风向相关系数在0.85~0.90,两种仪器测得的10 min平均风速偏差在0.1 m/s以内,相对偏差在1%左右,WindCube可代替测风塔进行风能资源评估;沿海地形条件下,WindCube与测风塔风速相关系数达0.90以上,风向相关系数在0.90左右,WindCube与测风塔测得的10 min平均风速偏差较大,达0.5 m/s,相对偏差在10%左右,受下垫面影响,WindCube替代测风塔进行风能资源评估的可行性应根据项目实际情况进一步评估。In order to verify the feasibility of the WindCube lidar substituting wind mast to evaluate wind resources under different terrain and measured altitudes conditions.This paper practices WindCube and wind mast simultaneouse observation experimental data under three terrain conditions:complex mountains,plains,and coastal.Comparative analysis of wind speed,wind direction,relative deviation,and wind profile are performed.The results illustrate the higher WindCube measurement height,the lower effective data rate is,and the effective data integrity rate is above 90%within the hub height range of 90~120 m,which satisfies wind energy resource assessment requirements.Under complex mountainous and plains topographic conditions,the wind speed correlation coefficient between WindCube and wind mast is above 0.99.The wind direction correlation coefficient is between 0.85~0.90.The deviation of 10-min average wind speed measured by the two instruments is within 0.1 m/s.The relative deviation is around 1%,WindCube can substitute wind mast for wind energy resource assessment in complex mountainous and flat terrain.Howeber,under coastal terrain conditions,the wind speed correlation coefficient between WindCube and wind mast is above 0.90,the wind direction correlation coefficient is around 0.90,the 10-min average wind speed measured by WindCube and wind mast has a large deviation up to0.5 m/s,and the relative deviation is about 10%.Coastal terrain is affected by the underlying surface,the feasibility of WindCube replacement of wind mast for wind energy resource assessment require further evaluation based on actual situation in the projects.
关 键 词:激光雷达 测风塔 风电场 同步观测 风能资源评估
分 类 号:TK83[动力工程及工程热物理—流体机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.36