尼尔森体系钢管混凝土拱桥吊杆张拉过程分析——以南沿江城际铁路七浦塘特大桥为例  被引量:1

Analysis of Suspender Tension Process of Concrete-filled Steel Tubular Arch Bridge with Nielsen System——Taking Qiputang Extra-large Bridge of Nanyanjiang Intercity Railway as an Example

在线阅读下载全文

作  者:曾珍 徐世桥 周述美 姚振亚 Zeng Zhen;Xu Shiqiao;Zhou Shumei;Yao Zhenya(China Construction Eighth Engineering Division Co.,Ltd.,Shanghai 200120)

机构地区:[1]中国建筑第八工程局,上海200120

出  处:《工程技术研究》2022年第12期6-8,共3页Engineering and Technological Research

摘  要:尼尔森吊杆体系系杆拱桥因具有良好的刚度而在近年来的高速铁路建设中得以广泛采用。由于这类桥梁常作为跨越繁忙运输通道的桥型选择方案,且桥梁的施工工期一般较紧,同时对施工安全及运输通道的防护性要求较高,因而施工控制工作十分必要。文章以某跨径为96 m的常见尼尔森吊杆体系系杆拱桥为例,对施工过程中的应力和线形进行了模拟分析,对同类桥梁的施工具有一定的指导意义。Nielsen suspender system tied arch bridge has been widely used in high-speed railway construction in recent years due to its good stiffness. Since this type of bridges are often used as bridge type selection schemes for crossing busy transportation channels, and the construction period of the bridges is generally tight, as well as the requirements for construction safety and transportation channel protection are relatively high, the construction control work is very necessary. Taking a common Nelson suspender system tied arch bridge with a span of 96 m as an example, this paper simulates and analyzes the stress and alignment during construction, which has certain guiding significance for the construction of similar bridges.

关 键 词:钢管混凝土拱桥 尼尔森体系 吊杆 

分 类 号:U448.22[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象