检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘兵 Liu Bing(Lüliang South Expressway Branch of Shanxi Transportation Holding Group Co.,Ltd.,Fenyang 032200,China)
机构地区:[1]山西交通控股集团有限公司吕梁南高速公路分公司,汾阳市032200
出 处:《北方交通》2022年第10期25-28,共4页Northern Communications
摘 要:为提高黄土填料高填方路堤压实质量,在选取典型断面开展理论计算的同时开展沉降监测。监测前期路堤横向各部分沉降变形速度较快,后期逐渐趋缓并达到稳定状态,其中以路堤中部变形最大。路堤中部纵向变形呈现监测前期变形量较大、后期逐步趋稳的变化规律。路堤沉降变形实测值小于理论计算值,说明路堤稳定性良好,达到了预期的压实效果。In order to improve the compaction quality of high fill embankment with loess filler,the settlement monitoring is carried out while selecting typical sections for theoretical calculation. In the early stage of monitoring,the settlement and deformation speed of the lateral parts of the embankment is relatively fast,and in the later stage,it gradually slows down and reaches a stable state,of which the deformation in the middle of the embankment is the largest. The longitudinal deformation in the middle of the embankment presents a change law of large deformation in the early monitoring period and gradual stabilization in the later monitoring period. The measured value of embankment settlement deformation is less than the theoretical calculation value, which indicates that the embankment stability is good and the expected compaction effect is achieved.
关 键 词:黄土填料 高填方路堤 压实效果 沉降监测 变形量
分 类 号:U416.12[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38