检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵东[1] 田倩[1] 郝付军[1] ZHAO Dong;TIAN Qian;HAO Fujun(Shaanxi Railway Institute,Weinan,Shaanxi 714000)
机构地区:[1]陕西铁路工程职业技术学院,陕西渭南714000
出 处:《地质与勘探》2022年第6期1261-1270,共10页Geology and Exploration
基 金:陕西铁路工程职业技术学院科研基金项目(编号:KY2021-36)资助。
摘 要:为合理实现炭质板岩隧道的大变形分级,以木寨岭隧道大变形段五个监测断面的监测成果为基础,利用极限位移准则实现其现状分级,利用递进优化思路构建隧道大变形预测模型,并根据外推预测结果的速率均值实现大变形发展趋势分级。结合隧道大变形的现状分级和发展趋势分级结果,开展隧道大变形发育程度的综合评价。实例分析表明:在大变形现状分级过程中,不同位置处的大变形等级存在一定差异,其中,以DK180+960 m断面的大变形程度相对最为严重,属Ⅴ级-极严重,其余四个断面的大变形等级为Ⅳ级-严重;通过发展趋势分级,得DK180+940 m断面和DK180+960 m断面的大变形发展趋势等级为2级,其余三个监测断面属1级,均具持续增加趋势,趋于不利方向发展。结合前述大变形现状分级和发展趋势分级结果,综合得出DK180+960 m断面的大变形最为不利,其次是DK180+940 m断面,其余三个断面的大变形程度相似。因此,可根据断面的大变形综合评价结论来制定具有针对性的防治措施,以达到优化现场防治措施的目的。In order to reasonably realize the large deformation classification of carbonaceous slate tunnels,this work utilized the limit displacement criterion to classify the present situation of the Muzhailing tunnel based on monitoring results of five monitoring sections in large deformation section.A prediction model of large deformation for the tunnel was constructed by using the idea of progressive optimization,and the development trend classification of large deformation was realized according to the average rate of extrapolation prediction.In combination with the classification of the current situation and development trend of large deformation,a comprehensive evaluation of the development degree of tunnel large deformation was conducted.The case analysis shows that,in the process of large deformation classification,there are some differences in the large deformation grades at different positions,among which the large deformation of section DK180+960 m is relatively the most significant,belonging to grade V-extremely serious,and the large deformation grade of the other four sections is grade IV-serious.The development trend classification indicates that,the development trend of large deformation of section DK180+940 m and section DK180+960 m is classified as Level 2,and the other three monitoring sections are Level 1,all of which have a continuous increasing trend and tend to develop in an unfavorable direction.Combined with the above classification results of large deformation status and development trend,the large deformation of section DK180+960 m is inferred to be the most unfavorable,followed by section DK180+940 m,and the large deformation degree of the other three sections is similar.Therefore,targeted prevention measures can be formulated according to the comprehensive evaluation conclusion of large deformation of the section,so as to optimize the on-site prevention measures.
关 键 词:炭质板岩 大变形 现状分级 发展趋势分级 木寨岭隧道
分 类 号:U25[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49