东莞市城市快速轨道交通R2线立体交叉设计  被引量:1

Grade Separation Design of Dongguan Urban Rapid Rail Transit Line R2

在线阅读下载全文

作  者:刘东亮 张大伟 田波 LIU Dongliang;ZHANG Dawei;TIAN Bo(China Railway Xi’an Survey and Design Institute Co.,Ltd.,Xi’an Shaanxi 710054,China)

机构地区:[1]中铁西安勘察设计研究院有限责任公司,陕西西安710054

出  处:《中国铁路》2022年第11期69-74,共6页China Railway

摘  要:针对建设空间狭小,同一地点多条铁路、公路交叉等原因形成的平面位置和高差等空间受限因素,开展东莞市城市快速轨道交通R2线交叉设计研究。在保持地面汽车交通正常通行、施工不影响地下城际铁路隧道的前提下,采用单双层门式框架墩、连续梁、U形梁等特殊结构,解决受限空间内复杂立体交叉的设计难题。该研究可为类似项目设计提供参考。In view of the spatial constraints such as plane position and elevation difference caused by narrow construction space and crossing of multiple railways and highways,the study is carried out on the crossing design of Dongguan Urban Rapid Rail Transit Line R2.To maintain normal automobile traffic on the ground and ensure the underground intercity railway tunnel is not affected by construction,special structures such as single and double-layer portal frame piers,continuous beams supported by concealed beams and U-beams are adopted to solve the design problems in case of complex grade separate in confined space.This study may be used as reference for similar design.

关 键 词:城市快速轨道交通 受限空间 复杂交叉 特殊结构 立体交叉 

分 类 号:U239.5[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象