检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王京宇 刘焕虎 WANG Jingyu;LIU Huanhu(Center of Construction Management&Quality&Safety Supervision,Ministry of Water Resources,Beijing 100038,China;Xiaolangdi Multipurpose Dam Project Management Center,Ministry of Water Resources,Jiyuan 454681,China)
机构地区:[1]水利部建设管理与质量安全中心,北京100038 [2]小浪底水利枢纽管理中心,河南济源454681
出 处:《水利建设与管理》2022年第12期45-49,共5页Water Conservancy Construction and Management
摘 要:水库大坝混凝土普遍存在缺陷问题,如混凝土开裂、冲蚀、剥落等,对于水面以上的缺陷,可以有多种处理材料与工艺,但对于水下部位建筑物的缺陷,受修补材料、设备及工艺的限制,长期以来一直得不到有效的解决。西霞院工程位于黄河干流上,经过黄河调水调沙运用,受到“大流量、高含沙”冲击,水下建筑物混凝土存在冲刷掏空现象。在西霞院工程水下建筑物破坏修复工作中,提出搭设水上施工平台和浇筑水下不分散混凝土的新施工工艺和方案,实施后经过一个汛期的考验,修复效果良好,该技术可为今后水下建筑物混凝土缺陷修复提供借鉴和指导。Defects are common in reservoir dam concrete,such as concrete cracking,erosion,peeling,etc.For the defects above the water surface,there can be a variety of treatment materials and technology.However,for the defects of underwater buildings,which are limited by repair materials,equipment and technology,they have not been effectively solved for a long time.Xixiyuan Project is located on the mainstream of the Yellow River.After the application of water and sand transfer in the Yellow River,it is affected by the impact of“large flow and high sand content”,and the phenomenon of erosion and hollowing out exists in the concrete of underwater buildings.In the repair work of underwater buildings in Xixiayuan Project,a new construction technology and scheme of building construction platform over water and pouring underwater anti-washout concrete are put forward,which has been tested in a flood season and proved to have good repair effect.This technology can provide reference and guidance for the repair of underwater building concrete defects in the future.
分 类 号:TV697[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.188.132.192