二维最大熵图像分割下的市政排水管网负荷均衡性控制模型  被引量:2

Load balance control model of municipal drainage network based on two-dimensional maximum entropy image segmentation

在线阅读下载全文

作  者:赵耀 ZHAO Yao(Henan Urban Planning and Design Research Institute Co.Ltd.,Zhengzhou Henan 450044,China)

机构地区:[1]河南省城乡规划设计研究总院股份有限公司,郑州450000

出  处:《自动化与仪器仪表》2022年第11期111-115,共5页Automation & Instrumentation

摘  要:为解决市政排水管网排水能力与实际排水需求不匹配的问题,构建基于二维最大熵图像分割的市政排水管网负荷均衡性控制模型。通过图像采集设备采集水尺图像后,以二维最大熵图像分割方法,分割图像的水尺目标与背景区域,提取水尺信息后,以排水量最大化为目标,构建市政排水管网负荷均衡性控制的目标函数,并由天牛须搜索粒子群算法求解可实现排水量最大化的排水管网负荷均衡性控制方案。实验验证:该模型应用后,市政排水管网排水量与降雨量基本一致,排水能力与实际排水需求匹配,且排水所耗费功耗较小,可实现市政排水管网负荷均衡性控制。In order to solve the problem that the drainage capacity of municipal drainage network does not match the actual drainage demand, a load balance control model of municipal drainage network based on two-dimensional maximum entropy image segmentation is constructed. After the water gauge image is collected by the image acquisition equipment, the water gauge target and background area of the image are segmented by the two-dimensional maximum entropy image segmentation method. After extracting the water gauge information, the objective function of the load balance control of the municipal drainage network is constructed with the goal of maximizing the drainage volume, and the tianniu search particle swarm optimization algorithm is used to solve the load balance control scheme of the drainage network that can maximize the drainage volume. Experimental verification: after the model is applied, the drainage volume of the municipal drainage network is basically consistent with the rainfall, the drainage capacity matches the actual drainage demand, and the drainage consumes less power, which can realize the load balance control of the municipal drainage network.

关 键 词:二维最大熵 图像分割 市政排水管网 负荷 均衡性 控制模型 

分 类 号:TU992.4[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象