检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王维[1] 曾逸民 任志伟[1] 林晓龙[1] WANG Wei;ZENG Yimin;REN Zhiwei;LIN Xiaolong(China Railway Eryuan Engineering Group Co.,Ltd.,Chengdu 610031,China)
机构地区:[1]中铁二院工程集团有限责任公司,成都610031
出 处:《高速铁路技术》2023年第1期68-75,共8页High Speed Railway Technology
摘 要:峨眉至米易段是成昆铁路扩能工程实施的最后一段,也是地形和地质条件最为复杂的一段。本文结合沿线的地形和地质条件,参考既有铁路地质灾害发生、发育及危害程度等,应用减灾选线的理论和方法,对沿线各类不良地质分类总结并确定相应的选线措施。研究成果可为复杂地质条件下的艰险山区铁路选线提供借鉴。The Emei-Miyi Section is the last section of the capacity expansion of Chengdu-Kunming Railway,and also the one with the most complex topographical and geological conditions.Based on the topographical and geological conditions along the line,consulting the occurrence,development,and degree of harm of geological disasters of existing railways,and applying the theory and method of route selection for disaster reduction,this paper summarized the classification of various unfavorable geological conditions along the line and determines the corresponding measures in route selection.The results can provide a reference for route selection of railways in difficult mountainous areas under complex geological conditions.
分 类 号:U212.12[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.91.228