减灾选线技术在成昆铁路扩能工程峨米段的应用  

Application of Disaster Reduction and Route Selection Technology in the Capacity Expansion of Emei-Miyi Section of Chengdu-Kunming Railway

在线阅读下载全文

作  者:王维[1] 曾逸民 任志伟[1] 林晓龙[1] WANG Wei;ZENG Yimin;REN Zhiwei;LIN Xiaolong(China Railway Eryuan Engineering Group Co.,Ltd.,Chengdu 610031,China)

机构地区:[1]中铁二院工程集团有限责任公司,成都610031

出  处:《高速铁路技术》2023年第1期68-75,共8页High Speed Railway Technology

摘  要:峨眉至米易段是成昆铁路扩能工程实施的最后一段,也是地形和地质条件最为复杂的一段。本文结合沿线的地形和地质条件,参考既有铁路地质灾害发生、发育及危害程度等,应用减灾选线的理论和方法,对沿线各类不良地质分类总结并确定相应的选线措施。研究成果可为复杂地质条件下的艰险山区铁路选线提供借鉴。The Emei-Miyi Section is the last section of the capacity expansion of Chengdu-Kunming Railway,and also the one with the most complex topographical and geological conditions.Based on the topographical and geological conditions along the line,consulting the occurrence,development,and degree of harm of geological disasters of existing railways,and applying the theory and method of route selection for disaster reduction,this paper summarized the classification of various unfavorable geological conditions along the line and determines the corresponding measures in route selection.The results can provide a reference for route selection of railways in difficult mountainous areas under complex geological conditions.

关 键 词:成昆铁路 复杂地质 艰险山区 减灾选线 

分 类 号:U212.12[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象