检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:叶堃[1] 丁浩江[1] 岳志勤[1] YE Kun;DING Haojiang;YUE Zhiqin(China Railway Eryuan Engineering Group Co.,Ltd.,Chengdu 610031,China)
机构地区:[1]中铁二院工程集团有限责任公司,成都610031
出 处:《高速铁路技术》2023年第1期81-85,90,共6页High Speed Railway Technology
摘 要:成贵高速铁路玉京山隧道施工中遭遇高速铁路建设史上的最大溶洞,溶洞下部发育大型暗河,洞内充填物厚度大,成分复杂,工程地质环境复杂,处理难度大、施工安全危险性高。现场采用地质调查及测绘、三维激光扫描、水文观测、物探、钻探、孔内测试、取样试验等综合勘察手段,查明了巨型溶洞的形态特征、水文地质特征和充填物工程地质特征,对洞壁稳定性进行了分析和评价,预测了洞顶塌落高度及稳定性,提出了“暗河改道、溶洞回填、桥梁跨越”总体处理措施建议,为合理确定施工整治方案提供了详实的地质依据。研究成果可为山区高速铁路岩溶勘察提供重要参考。During the construction of the Yujingshan Tunnel of Chengdu-Guiyang High-speed Railway,the largest karst cave in the history of high-speed railway construction was encountered,where the geological environment is complicated,with large underground rivers developed underneath and thick filling materials of complex composition inside.The treatment is difficult,and the construction safety risk is high.Comprehensive investigation methods including geological survey and mapping,3D laser scanning,hydrological observation,geophysical prospecting,drilling,in-hole testing,and sampling tests were applied on-site to find out the morphological characteristics,hydrogeological characteristics,and geological characteristics of fillings in this giant karst cave,analyze and evaluate the stability of cave walls,and predict the collapsed height and stability of the roof.The overall treatment measure of“ diverting underground rivers,backfilling karst cave,and crossing with bridges ”was put forward,which provided a detailed geological basis for reasonably determining the construction treatment scheme.The research results can provide an important reference for investigating the karsts of high-speed railways in mountainous areas.
分 类 号:P642.25[天文地球—工程地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.94