检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张成 宋棋龙 彭元栋 王虎 林星涛 苏栋[2,5] ZHANG Cheng;SONG Qi-long;PENG Yuan-dong;WANG Hu;LIN Xing-tao;SU Dong(Zhuhai Dahengqin City New Center Development Co.,Ltd.,Zhuhai 519030,China;College of Civil and Transportation Engineering,Shenzhen University,Shenzhen 518060,China;China Railway 15 Bureau Group Co.,Ltd.,Shanghai 200070,China;Zhuhai Planning and Design Institute,Zhuhai 519000,China;Key Laboratory of Coastal Urban Resilient Infrastructures(MOE),Shenzhen 518060,China)
机构地区:[1]珠海大横琴城市新中心发展有限公司,珠海519030 [2]深圳大学土木与交通工程学院,深圳518060 [3]中铁十五局集团有限公司,上海200070 [4]珠海市规划设计研究院,珠海519000 [5]滨海城市韧性基础设施教育部重点实验室(深圳大学),深圳518060
出 处:《科学技术与工程》2023年第6期2579-2586,共8页Science Technology and Engineering
基 金:国家自然科学基金(51938008);中铁十五局科研项目(CR15CG-ZH-HQMZSD-2021-00001(KJ))。
摘 要:为确定软土地层浅埋超大直径盾构始发端头加固的合理范围,以珠海杧州隧道为工程背景,采用有限元建模分析,研究了端头加固范围对素混凝土墙破除以及盾构始发掘进过程地层变形的影响。基于数值分析结果,以端头中心点水平位移为控制目标,得出横、竖向合理加固厚度约为0.28倍隧道开挖面直径,略大于理论计算值和工程经验值。盾构掘进模拟结果表明,当纵向加固长度超过盾构机长度后,横断面受剪区域未与地表形成“塑性贯通”,端头盾构掘进对地表扰动程度较低;如以地表最大沉降为控制值,软土地层合理加固长度为1.14倍盾构机长度,该结果与理论计算值接近,而略小于工程经验值。In order to determine the reasonable range of ground reinforcement of starting end for the shallow-buried super-large diameter shield in soft soil layer,the finite element modeling of the Mangzhou tunnel project in Zhuhai was setup and influence of the reinforcement range on the ground deformation during destruction of plain concrete walls and the initial excavation of shield tunnel was investigated.According to the results of numerical analyses,the reasonable horizontal and vertical reinforcement thickness is about 0.28 times the diameter of the tunnel when the horizontal displacement at the center point of starting end is taken as the control target.The value is slightly larger than the ones calculated by the theoretical formula and estimated based on the engineering experience.Numerical results show that the shear area of the cross section does not form a“plastic penetration”to the ground surface when the longitudinal reinforcement length exceeds the length of the shield machine.In this scenario,the end shield tunneling will impose low-degree disturbance to the ground surface.When the maximum surface settlement is taken as the control value,the reasonable reinforcement length obtained through numerical analyses is 1.14 times the length of the shield machine.The value is close to that derived from the theoretical formula,but slightly less than the value determined based on the engineering experience.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117