检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:傅勇平 FU Yongping(Hong Kong Hua Yi Deign Consultants(S.Z)Co.,Ltd.,Shenzhen 518000,China)
机构地区:[1]香港华艺设计顾问(深圳)有限公司,广东深圳518000
出 处:《现代建筑电气》2023年第3期31-35,68,共6页Modern Architecture Electric
摘 要:分析了大型医疗设备供电规范中供电电源应满足大型医疗设备关于电源电压及内阻的要求。根据电路理论分析,用等效电源建立模型,得出结论:在变压器容量大及干线内阻小的情况下,楼层配电室的电源质量优于小型变压器旁出口处的电源质量,配变电所供电不能简单理解为物理上的变压器旁的配电室,也可以是楼层配电室,大型医疗设备可以采用树干或混合式配电。This paper analyzes the power supply standards of large medical equipment:power supply should meet the requirements of large medical equipment on power supply voltage and internal resistance.According to circuit theory analysis,it draws the following conclusion from our model based on equivalent power supply:under the condition of large transformer capacity and small main line internal resistance,the power quality of the floor distribution room is better than the power quality of the outlet of the small transformer.The power supply from the distribution substation cannot be simply understood as the distribution room physically next to the transformer,as it can also be the floor distribution room,that is,large medical equipment can adopt trunk or hybrid power distribution.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49