检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:曾云飞 熊鹏文[1] 江振宇 刘源 宋爱国[4] ZENG Yunfei;XIONG Pengwen;JIANG Zhenyu;LIU Yuan;SONG Aiguo(School of Advanced Manufacturing,Nanchang University,Nanchang 330031,China;School of Future Technology,Nanchang University,Nanchang 330031,China;Construction Branch,State Grid Jiangxi Electric Power Co.,Ltd.,Nanchang 330031,China;School of Instrument Science and Engineering,Southeast University,Nanjing 210096,China)
机构地区:[1]南昌大学先进制造学院,江西南昌330031 [2]南昌大学未来技术学院,江西南昌330031 [3]国网江西省电力有限公司建设分公司,江西南昌330031 [4]东南大学仪器科学与工程学院,江苏南京210096
出 处:《测控技术》2023年第4期88-93,107,共7页Measurement & Control Technology
基 金:国家自然科学基金(62163024,61903175,61663027);国网江西省电力有限公司科技项目资助(52182420001C);江西省“双千计划”(jxsq2023201097)。
摘 要:电力铁塔组立是危险系数极高的工作。为了保障施工安全,施工前有安全作业理论验算和严格的施工流程步骤管理,施工中有各种规章制度约束并采用视频监控等方式进行监督。但上述方式缺乏直接的力检测手段,为解决此难题,提出一种适用于内悬浮外(内)拉线组塔工艺承力系统的力检测方案,检测其吊装过程中抱杆系统的受力情况。以实际应用为目标,针对抱杆系统开发出卸扣力传感器、钢丝绳张力传感器和抱杆姿态仪等设备,详细说明了各传感器的安装位置,结合ZigBee无线通信技术,配合上位机软件,实现对组塔吊装过程的实时监控和预测预警。通过现场试用,表明该检测系统测量精确、安装方便,能满足现场检测要求。Power tower erection is a work with extremely high risk factor.In order to ensure construction safety,there are theoretical checking of safe operation and strict management of construction process steps before construction,and there are various rules and regulations and video monitoring are used for supervision during construction.However,the above methods lack direct force detection means.In order to solve this problem,a force detection scheme that is suitable for the internal suspension external(internal)guyed tower assembly process bearing system is proposed to detect the force on the holding pole system during its hoisting process.Aiming at the practical application,the shackle force sensor,wire rope tension sensor,derrick attitude meter and other equipment are developed for the holding pole system,and the installation position of each sensor is described in detail.Combined with ZigBee wireless communication technology and the upper computer software,the real-time monitoring,prediction and early warning of the tower assembly and hoisting process are realized.The field trial shows that the detection system is accurate in measurement,easy to install,and can meet the requirements of on-site detection.
分 类 号:TP212[自动化与计算机技术—检测技术与自动化装置]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.91