检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:崔艺斌 王冠男 CUI Yi-bin;WANG Guan-nan(Hefei Branch,Shanghai Municipal Engineering Design InstituteCo.,Ltd.,Hefei 200231,China)
机构地区:[1]上海市政工程设计研究总院(集团)有限公司合肥分公司,安徽合肥200231
出 处:《中国市政工程》2023年第2期60-63,108,109,共6页China Municipal Engineering
摘 要:城市明挖隧道通常采用现浇钢筋混凝土闭合框架结构,单层隧道可按沿隧道纵向长度为1m的平面框架计算,双层共板隧道结构受力与单层隧道存在明显不同之处。结合某实际工程,对双层共板隧道结构模型建立、荷载加载方式、受力特点进行计算分析和对比,可为类似工程设计提供一定参考。Urban open cut tunnels usually adopt a cast-in-place reinforced concrete closed frame structure,and single-layer tunnels can be calculated as a plane frame with a longitudinal length of 1 m along the tunnel.There are significant differences in the stress of the doublelayer common plate tunnel structure compared to single-layer tunnels.Based on a practical project,the establishment of a double layer tunnel structure model,load loading methods,and stress characteristics are calculated,analyzed,and compared,which can provide certain reference for similar engineering designs.
分 类 号:U452.2[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222