实心高桥墩施工技术在新内马铁路桥梁项目中的应用  被引量:4

The Application of Solid High Pier Construction Technology in the New Nairobi-Malaba Railway Bridge Project

在线阅读下载全文

作  者:李毅超 LI Yichao(CCCC Second Harbor Engineering Co.,Ltd.,Wuhan 430021,Hubei,China)

机构地区:[1]中交第二航务工程局有限公司,湖北武汉430021

出  处:《工程技术研究》2023年第3期53-55,共3页Engineering and Technological Research

摘  要:文章以新内马铁路项目一期工程线路桥梁实心高桥墩项目为例,阐述了实心高桥墩施工技术的应用要点,具体分析实心高桥墩施工准备工作,并详细探讨了实心高桥墩工程中钢筋工程、模板工程及混凝土工程的施工技术要点,以提高高墩的施工效率,降低高墩施工安全风险,保障桥梁高墩工程顺利进行,促进桥梁工程事业的长远发展。Taking the bridge solid high pier project of the first phase of the new Nairobi-Malaba Railway project as an example, this paper expounds the application points of the solid high pier construction technology, specifically analyzes the preparation work of the solid high pier construction, and discusses in detail the construction technical points of the steel bar engineering, formwork engineering and concrete engineering in the solid high pier project, in order to improve the construction efficiency of the high pier, reduce the safety risk of the high pier construction, ensure the smooth progress of the bridge high pier project, and promote the long-term development of the bridge engineering.

关 键 词:铁路桥梁 实心高桥墩 施工技术 

分 类 号:U445.559[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象