检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:沈龙清 苏静波[1] 吴锋 刘旭 季晓堂 SHEN Long-qing;SU Jing-bo;WU Feng;LIU Xu;JI Xiao-tang(Hohai University,Nanjing,Jiangsu 210098,China;CCCC Shanghai Harbour Engineering Designing&Research Institute Co.,Ltd.,Shanghai 200032,China)
机构地区:[1]河海大学,江苏南京210098 [2]中交上海港湾工程设计研究院有限公司,上海200032
出 处:《中国港湾建设》2023年第4期1-4,14,共5页China Harbour Engineering
基 金:国家自然科学基金(51679081)。
摘 要:为解决在役高桩码头在船舶靠泊时的响应预测预警问题,提高高桩码头的结构损伤监测和评估效率,基于某高桩码头实例,利用Midas/GTS NX软件建立了考虑桩-土相互作用的高桩梁板式码头三维有限元模型;研究船舶靠泊时的高桩码头结构失效模式并确定了响应面参数,建立了高桩码头结构响应的响应面方程;对响应面方程进行拟合优度检验、F检验和t检验,验证了方程的准确性,同时分析了各影响因素对不同结构响应的显著性;最后通过误差分析对高桩码头结构响应的预测结果进行评价。研究成果可以为高桩码头结构的响应预测提供借鉴。In order to solve the problem in predicting and warning the response of an in-service long piled wharf when a ship berths to it,and to improve the efficiency of monitoring and assessing the structural damage of a long piled wharf,a three-dimensional finite element model of a long piled beam-slab wharf considering pile-soil interaction was established based on an example of a long piled wharf using Midas/GTS NX software.The structural failure mode of a long piled wharf when a ship is berthing was studied and the response surface parameters were determined.The response surface equations for the structural response of a long piled wharf was established.Goodness-of-fit test,F-test and t-test were carried out to verify the accuracy of the equations and the significance of various influencing factors on the response of different structures was also analyzed.Finally,the predicted results of the structural response of a long piled wharf were evaluated through error analysis.The results of the study can be useful for the response prediction of long piled wharf structures.
分 类 号:U656.113[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.218.83.143