检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘畅 张宇 宋洁 许日成 LIU Chang;ZHANG Yu;SONG Jie;XU Richeng(China Coal Technology and Engineering Coal Mining Research Institute,Bejing 100013,China;Coal Mining and Designing Department,Tiandi Science and Technology Co.,Ltd.,Beijing 100013,China;Testing Branch,China Coal Technology and Engineering Group China Coal Research Institute,Bejing 100013,China;Xuzhou Inspection Testing Center,Xuzhou 221111,China)
机构地区:[1]中煤科工开采研究院有限公司,北京100013 [2]天地科技股份有限公司开采设计事业部,北京100013 [3]煤炭科学技术研究院有限公司检测分院,北京100013 [4]徐州市检验检测中心,江苏徐州221111
出 处:《煤矿安全》2023年第2期100-106,共7页Safety in Coal Mines
基 金:国家自然科学基金资助项目(52104091);国家重点研发计划资助项目(2020YFB1314002)。
摘 要:针对宝积山矿705工作面临空巷道冲击地压事故,通过现场调研、理论分析、数值模拟和现场试验等方法,对褶曲构造带冲击发生机理及防治技术进行了研究。结果表明:1#煤层具有强冲击倾向性,1#煤顶底板岩层具有弱冲击倾向性;随着煤层倾角减小,处于采空区下侧的支承压力增大,处于采空区上侧的支承压力减小,临空巷道实体煤侧在倾角30°时出现“L”形应力集中区;煤层倾角从45°向0°变化时,应力集中程度越来越高;相比于相邻703工作面,705工作面煤层倾角减小,煤层中集中程度更高;褶曲构造带附近应力集中情况增加是引起冲击的内因。提出了大直径钻孔联合高压注水卸压和加强支护协同控制技术,并进行现场应用,电磁辐射监测结果表明卸压及控制效果明显。Aiming at the occurrence of rock burst along gob-side roadway in No.705 mining area of Baojishan Coal Mine, the occurrence mechanism of rock burst in folding structure is studied by means of field investigation, theoretical analysis, numerical simulation and field test. The results show that: 1#coal seam has strong impact tendency, and 1#coal roof and floor rock stratum has weak impact tendency. With the decrease of coal seam dip angle, the pressure on the lower side of gob increases, while the pressure on the upper side of gob decreases. The L-shaped stress concentration area appears on the solid coal side of gob at 30°.With the change of coal seam dip angle from 45° to 0°, the stress concentration is higher. Compared with the adjacent 703working face, the coal seam dip angle of No.705 working face is reduced, and the degree of concentration in the coal seam is higher. Therefore, the increase of stress concentration in the fold structural belt is the internal factor. The technology of large diameter borehole combined with high pressure water injection and pressure relief and strengthening support cooperative control are proposed and applied in the field. The results of electromagnetic radiation monitoring show that the pressure relief and control effect is obvious.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.198