长春轻轨一期项目车辆新型固定铰设计  被引量:1

Design of new lower articulated device for vehicles of Changchun Light Rail Phase I Project

在线阅读下载全文

作  者:蒋于龙 雷桢禹 JIANG Yulong;LEI Zhenyu(CRRC Brake System Co.,Ltd.,Qingdao 266031,China;CRRC Changchun Railway Vehicles Co.,Ltd.,Changchun 130062,China)

机构地区:[1]中车制动系统有限公司,山东青岛266031 [2]中车长春轨道客车股份有限公司,吉林长春130062

出  处:《电力机车与城轨车辆》2023年第3期25-30,共6页Electric Locomotives & Mass Transit Vehicles

摘  要:针对长春轻轨一期项目车辆固定铰存在的问题,设计了一种新型固定铰结构,可与原车完全兼容,且在维修、维护、减重等方面均有提升。文章阐述了新型固定铰的结构特点,结合其受力工况进行了静强度及疲劳强度分析,并搭建三向加载的试验装置进行了相关试验。试验结果和装车运用情况均表明该新型固定铰可满足使用要求。In view of the problems of the lower articulated device for Changchun Light Rail Phase I Project vehicle,a new lower articulated device structure is designed,which can be fully compatible with the original vehicle and improved in repair,maintenance,weight loss and other aspects.This paper expounds the structural characteristics of the new lower articulated device,analyzes the static strength and fatigue strength in combination with its stress conditions,and builds a three-dimensional loading test device to carry out relevant tests.The test results and loading conditions show that the new lower articulated device can meet the requirements.

关 键 词:长春轻轨 车辆 固定铰 静强度 疲劳强度 

分 类 号:U270.34[机械工程—车辆工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象