隧道仰拱移动模架分段快速施工技术  

Rapid Construction Technology for Segmented Moving Formwork of Tunnel Invert Arch

在线阅读下载全文

作  者:钟贤军 ZHONG Xian-jun(The 3rd Engineering Co.,Ltd.of China Railway 17th Bureau Group,Shijiazhuang 050081,China)

机构地区:[1]中铁十七局集团第三工程有限公司,石家庄050081

出  处:《价值工程》2023年第16期154-156,共3页Value Engineering

摘  要:本文针对不良地质高风险隧道,遵循“短进尺”“早闭环”基本施工原则,详细介绍了用于隧道仰拱结构分段浇筑移动模架结构的设计和加工。总结了仰拱和边墙整体同步浇筑施工工艺,同时,解决了传统模板仰拱、边墙独立浇筑存在施工缝质量隐患、模板安装难度大及辅助钢筋用量多、流水施工循环周期长、模板抗浮能力弱等缺点。在工程实践中取得了良好应用效果,以期为类似工程施工提供借鉴和参考。Focusing on high-risk tunnels with unfavorable geological conditions,and following the basic construction principles of"short footage"and"early closed-loop",this article provides a detailed introduction to the design and processing of mobile formwork structures used for segmented pouring of tunnel inverted arch structures.It summarized the construction process of synchronous pouring of the inverted arch and side wall as a whole,and solved the shortcomings of traditional formwork inverted arch and independent pouring of side wall,such as hidden quality hazards of construction joints,difficulty in formwork installation,large amount of auxiliary steel bars,long flow construction cycle,and weak anti floating ability of the formwork.Good application results have been achieved in engineering practice,with the aim of providing reference for similar engineering construction.

关 键 词:隧道 仰拱 移动模架 分段 施工 

分 类 号:U445.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象