作 者:罗华平[1] 廖杭 朱宁波 李梦可 方勇[2] 田青峰 LUO Hua-ping;LIAO Hang;ZHU Ning-bo;LI Meng-ke;FANG Yong;TIAN Qing-feng(Sichuan Road&Bridge(Group)Co.,Ltd.Highway Three Branch,Chengdu 610200,China;Civil Engineering College,Southwest Jiaotong University,Chengdu 610031,China;China Railway Siyuan Survey and Design Institute Group Co.,Ltd.,Wuhan 430063,China)
机构地区:[1]四川公路桥梁建设集团有限公司公路三分公司,成都610200 [2]西南交通大学土木工程学院,成都610031 [3]中铁第四勘察设计院集团有限公司,武汉430063
出 处:《科学技术与工程》2023年第16期7104-7111,共8页Science Technology and Engineering
基 金:国家自然科学基金(52078428);四川省杰出青年基金(2020JDJQ0032)。
摘 要:粉煤灰堆积体自稳能力差,受力即破碎成散颗粒,隧道穿越粉煤灰场区时失稳围岩对施工安全构成极大威胁。以盐坪坝连拱隧道为依托,根据粉煤灰力学性质对比选用了塑性-硬化本构,通过有限差分软件FLAC3D对不同开挖错距施工进行数值模拟,研究5、10、15 m不同开挖错距对粉煤灰堆积地层中双连拱隧道的围岩和结构的影响。结果表明:中导洞台阶开挖错距不宜超过10 m,15 m错距工况相比10 m错距工况应力最大值增长了36.82%,左右洞采用小开挖错距可以有效减少中导洞拱顶位移;中导洞开挖完成后左右洞拱顶竖向位移达到总沉降量约50%,左洞拱顶沉降位移与开挖错距近似线性增长,后行洞开挖过程中对先行洞造成的影响较大;主洞采用不同开挖错距时应力集中区域分布在不同位置,开挖错距大于10 m后结构应力增幅快速增长,15 m错距相比10 m错距应力最大值增长了17.28%,主洞开挖错距不宜超过10 m。The self-stability of fly ash accumulation body is poor,and it is broken into scattered particles after stress.When the tunnel passes through the fly ash field,the unstable surrounding rock poses a great threat to the construction safety.Based on the double-arch tunnel of Yanpingba,the plastic-hardening constitutive model was selected according to the comparison of mechanical properties of fly ash.The finite difference software FLAC3D was used to simulate the construction of different excavation offsets.The influence of different excavation stagger distances of 5,10,15 m on the surrounding rock and structure of double-arch tunnel in fly ash accumulation stratum was studied.The results show that the step excavation offset of the pilot tunnel should not exceed 10 m,and the maximum stress of the 15 m offset condition increases by 36.82%compared with that of the 10 m offset condition.The small excavation offset of the left and right tunnels can effectively reduce the displacement of the arch top of the pilot tunnel.After the completion of the excavation of the middle pilot tunnel,the vertical displacement of the left and right vaults has reached about 50%of the total settlement.The settlement displacement of the left tunnel vault increases approximately linearly with the excavation offset,and the excavation of the subsequent tunnel has a greater impact on the first tunnel.The stress concentration area was distributed in different positions when the main tunnels was excavated with different offsets.The stress increment of the structure increased rapidly after 10 m offset,and the maximum stress of 15 m offset increased by 17.28%compared with 10 m offset.The excavation distance of the main tunnel should not exceed 10 m.
关 键 词:公路隧道 粉煤灰堆积体 数值计算 开挖错距 双连拱隧道 围岩变形
分 类 号:U451.2[建筑科学—桥梁与隧道工程]