检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙琦[1] 陈迪郁 骆钊 SUN Qi;CHEN Di-yu;LUO Zhao(CCCC Second Harbor Engineering Co.,Ltd.,Wuhan,Hubei 430040,China;Key Laboratory of Large-span Bridge Construction Technology,Ministry of Communications,Wuhan,Hubei 430040,China;Research and Development Center of Transport Industry of Intelligent Manufacturing Technologies of Transport Infrastructure,Wuhan,Hubei 430040,China;CCCC Highway Bridge National Engineering Research Centre Co.,Ltd.,Beijing 100120,China)
机构地区:[1]中交第二航务工程局有限公司,湖北武汉430040 [2]长大桥梁建设施工技术交通行业重点实验室,湖北武汉430040 [3]交通运输行业交通基础设施智能制造技术研发中心,湖北武汉430040 [4]中交公路长大桥建设国家工程研究中心有限公司,北京100120
出 处:《中国港湾建设》2023年第5期25-29,56,共6页China Harbour Engineering
基 金:山东省重点研发计划(重大科技创新工程)(2021ZLGX04)。
摘 要:工程船舶在海况条件相对较差、受中长周期波浪影响的海域作业时,其作业窗口期一般较短,通常会降低施工工效,严重时也会引发系泊系统破坏或船舶倾覆事故。为了有效地解决这类问题,以海力801打桩船为例,采用水动力AQWA软件对该船舶在南美某海域风浪流共同作用下的运动响应以及系缆受力进行数值模拟,研究了不同水深、抛锚缆长度和预张力等参数对船舶运动的影响。计算结果表明,在深水区系泊有助于缓解船舶的纵横摇运动;抛锚缆长度选取6~10倍水深时,船舶运动响应和系泊系统整体受力较小;横摇运动对预张力的变化较为敏感,但是预张力对纵摇运动几乎没有影响。The operating window period of engineering ship is relatively short during their operations under the influence of long and medium period waves and in relatively severe sea conditions,which will generally reduce the working efficiency and,in more serious cases,cause also damage to the mooring system or capsizing of a piling ship.Floating pile driver Haili 801 is taken as an example for analysis in order to effectively solve such problems.AQWA is used to numerically simulate the dynamic response and the force on the mooring lines of the piling ship due to the integral action of winds,currents and waves in a South American sea area.The effects of different parameters including water depths,mooring line length and pretension on the motion response of the ship are studied.The results show that mooring in deeper waters will reduce pitch and roll motion of the ship;the motion response and the forces on the mooring system are smaller when the cable length is 6 to 10 times the water depth;and the roll motion is sensitive to the change of pretension,but pretension has lttle effect on pitch motion.
关 键 词:中长周期波 AQWA 船舶水动力 运动响应 系泊特性
分 类 号:U674.32[交通运输工程—船舶及航道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.15.234.89