检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:程康 徐日庆[2,3] 应宏伟 李冰河[5] 张金红 CHENG Kang;XU Riqing;YING Hongwei;LI Binghe;ZHANG Jinhong(China Railway 11th Bureau Group Co.Ltd.,Wuhan 430061,China;Research Center of Coastal and Urban Geotechnical Engineering,Zhejiang University,Hangzhou 310058,China;Engineering Research Center of Urban Underground Development of Zhejiang Province,Hangzhou 310058,China;Institute of Geotechnical Engineering Science,Hohai University,Nanjing 210098,China;Zhejiang Province Architectural Design and Research Institute,Hangzhou 310058,China)
机构地区:[1]中铁十一局集团有限公司,湖北武汉430061 [2]浙江大学滨海和城市岩土工程研究中心,浙江杭州310058 [3]浙江省城市地下空间开发工程技术研究中心,浙江杭州310058 [4]河海大学岩土工程科学研究所,江苏南京210098 [5]浙江省建筑设计研究院,浙江杭州310058
出 处:《中南大学学报(自然科学版)》2023年第5期1851-1862,共12页Journal of Central South University:Science and Technology
基 金:国家自然科学基金资助项目(41672264);浙江省重点研发计划项目(2019C03103)。
摘 要:基于所收集的16个杭州地铁基坑案例,首先,建立基坑相对“标准化模型”,包括基坑物理参数模型、基坑施工过程模型以及场地土层参数模型,并由此进行三维有限元建模分析;其次,将建模计算的地表沉降值与工程实测、既有文献解进行对比,验证所建标准化模型的准确性,并提出考虑全开挖过程的杭州地铁车站基坑坑外任意地表沉降实用计算方法;最后,分析杭州地铁基坑各开挖阶段地表沉降特征。研究结果表明:当开挖深度超过7 m时,坑外地表横向沉降曲线由“悬臂状”转化为“三段式”折线;随挖深的增加,地表沉降显著增大,地表最大沉降的位置距基坑距离也逐渐增大。所建标准化模型和所提实用计算方法具有准确性。Based on the collected 16 cases of Hangzhou metro basement,the relative "standardized model" of basement was firstly established,including the physical parameters of basement,excavation process and soil distribution,and the three-dimensional finite element modeling analysis was carried out.By comparing the ground surface settlement obtained from the numerical model with the measured data as well as the existing solutions from the published literature,the accuracy of the numerical model was verified.Subsequently,a practical calculation method considering the dynamic excavation was proposed to predict the transverse and longitudinal ground surface settlement outside excavation.Finally,the deformation characteristics of ground surface settlement during each stage could be furthely analyzed.The results show that when the excavation depth exceeds 7 m,the transverse ground surface settlement outside the excavation is transforms from "cantilever" to "three-stage" broken line distribution.With the increase of excavation depth,the transverse ground surface settlement and its transverse distance to excavation increase significantly.The proposed model and method are both accurate.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200