检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王新华 赵德忠 速春秀 何玉鸿 杜炳钧 WANG Xin-hua;ZHAO De-zhong;SU Chun-xiu;HE Yu-hong;DU Bing-jun(Yunnan Yun Aluminum Lvyuan Huibang Engineering Technology Co.,Ltd.,Kunming,Yunnan 650502,China)
机构地区:[1]云南云铝绿源慧邦工程技术有限公司,云南昆明650502
出 处:《云南冶金》2023年第3期199-204,共6页Yunnan Metallurgy
摘 要:针对石墨化炉炉墙预制件浇注过程中人员、机械设备配置不足及现场环境差、整体浇注质量差的问题,采取了优化人员、机械设备配置及现场环境;优化原辅料选择、浇注工艺控制等措施,提高了预制件整体浇注质量:整体炉墙总长350 m,误差≤20 mm,常温测量G-60炉墙预制件强度为38 MPa,满足设计要求并实现了批量生产。In the process of pouring process on prefabricated components of graphite furnace wall,there is insufficient arrangement of staff,insufficient mechanical equipment,bad environment,bad overall pouring quality and other problems,therefore the following measures were taken to improve the overall pouring quality of prefabricated components,which are optimization of arrangement of staff,equipment and field environment;optimization of selection of raw material,pouring process control and so on,therefore the total length of overall furnace wall is 350 m,error≤20 mm,the strengthen of prefabricated components of G-60 furnace wall at normal temperature is 38 MPa,it can meet the design requirements and realize batch production.
关 键 词:石墨化炉 炉墙 预制件 浇注质量 整体浇注 浇注工艺
分 类 号:TF06[冶金工程—冶金物理化学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.122