检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘骞 LIU Qian(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041
出 处:《云南水力发电》2023年第8期73-76,共4页Yunnan Water Power
摘 要:随着我国经济及高铁施工技术的飞速发展,人们对于乘坐高铁出行的依赖程度也逐渐提高,各个城市之间的高速铁路也日趋完善。无砟轨道施工技术作为高铁施工中的关键技术,对于高铁的施工质量控制,减少工程的施工成本,高铁运营期运行的安全性、使用耐久性,以及乘客的乘坐舒适性起着关键的作用。结合项目的实际情况对高速铁路隔离层、弹性垫层施工关键技术进行了分析总结。With the rapid development of China's economy and high-speed rail construction technology,people's dependence on high-speed rail travel has gradually increased,and high-speed railways between various cities are also becoming increasingly perfect.As the key technology in high-speed railway construction,ballastless track construction technology plays a key role in the quality control of high-speed railway construction,reducing the construction cost of the project,the safety and durability of high-speed railway operation during the operation period,and the comfort of passengers.This article analyzes and summarizes the key technologies for the construction of high-speed railway isolation layer and elastic cushion layer based on the actual situation of the project.
分 类 号:U213.1[交通运输工程—道路与铁道工程] TU753[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7