检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]贵阳人文科技学院,贵阳550025 [2]贵州大学,贵阳550025
出 处:《科技创新与应用》2023年第25期139-142,共4页Technology Innovation and Application
基 金:贵阳人文科技学院2022年度科研基金项目(2022rejs048)。
摘 要:在软弱浅埋隧道施工中,为保证隧道正常施工和减小对地面建筑影响,该文采用Midas GTS NX有限元分析软件结合贵阳轨道交通3号线某施工段为背景,对比分析悬臂掘进机施工二台阶法、CD法、CRD法。分析3种工法的地表沉降、拱腰收敛、围岩应力,最后得出CRD法施工对围岩的扰动性小。In the weak shallow tunnel construction,in order to ensure the normal construction of the tunnel and reduce the influence on the ground building,this paper uses the Midas GTS NX finite element analysis software combined with the construction section of Guiyang Rail Transit Line 3 as the background to compare and analyze the cantilever roadheader construction two-stage method,CD method and CRD method.The surface subsidence,arch waist convergence and surrounding rock stress of the three construction methods are analyzed,and it is concluded that the disturbance of CRD construction to the surrounding rock is small.
关 键 词:浅埋隧道 悬臂掘进机 二台阶法 CD法 CRD法
分 类 号:U25[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15