检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨卫超 Yang Weichao(Shaanxi 194 Coal Mine Geological Co.,Ltd.,Tongchuan,Shaanxi,727000)
机构地区:[1]陕西省一九四煤田地质有限公司,陕西铜川727000
出 处:《中国井矿盐》2023年第5期24-26,共3页China Well and Rock Salt
摘 要:作为定向钻进水平连通井组,须探明盐矿层顶板及其上下标志层的地层情况,以便与先期完钻的直井进行层位对比。该盐矿拟采用定向水平井连通法进行水溶开采,为提高定向水平井的“中靶”概率,采用精准定位技术实现一次“中靶”连通,使该井组迅速投入生产,确保了采区先期施工井组满足采输卤装置区的总产量要求。As a horizontal connected well group in directional drilling,it is necessary to find out the stratigraphic conditions of the salt deposit roof and its upper and lower marker layers,so as to compare with the vertical wells drilled earlier.The salt mine intends to adopt the directional horizontal well connectivity method for water solution mining.In order to improve the probability o“f hitting the target”of the directional horizontal well,the precision positioning technology is adopted to achieve a“hitting the target”connectivity,so that the well group can be put into production quickly and ensure that the pre-construction well group in the mining area can meet the total output requirements of the halogen production unit area.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.179