检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:薛长利[1] 李军平[1] 田景辉 田刚毅 Xue Changli;Li Junping;Tian Jinghui;Tian Gangyi(China Railway Baoqiao Group Co.,Ltd.,Baoji Shaanxi 721006,China)
出 处:《山西建筑》2023年第19期158-161,共4页Shanxi Architecture
摘 要:以咸阳高科一路跨渭河大桥为例,无背索斜拉桥空间角度钢-混组合塔建造线形控制是较为复杂的过程,需经过设计阶段的预偏线形计算,加工阶段的制造精度控制,安装阶段的定位、检测及纠偏,体系转化阶段的索拉力及塔(梁)线形监测调整等。通过对各个阶段进行深入研究,制定针对性的技术实施方案,并严格予以落实控制,钢塔柱建造线形满足设计要求,线形顺滑,观感优良。Taking Gaokeyilu highway crossing the Weihe River Bridge in Xianyang City as an example,the linear control for spatial steel-hybrid combination construction of backless cable-stayed bridges is a rather complicated process.It needs to go through the pre-biased linear calculation at design phase,manufacturing accuracy control at the processing phase,positioning,detection and correction at the installation phase,and linear monitoring and adjustment of cable tension and tower(girder)at the system transformation phase,etc..Through in-depth research at each stage,if formulates corresponding technical implementation scheme and strict control system.As a result,the steel tower construction linear meets the design requirement with smooth line and excellent view.
关 键 词:无背索斜拉桥 空间角度钢-混组合塔 预偏线形 成桥线形 控制技术
分 类 号:TU761.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229