检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张志恒 Zhang Zhiheng
机构地区:[1]中煤第三建设(集团)有限责任公司,合肥230031
出 处:《装备机械》2023年第3期16-21,38,共7页The Magazine on Equipment Machinery
摘 要:地铁工程施工条件复杂,受城市建筑、管线水网、交通环境等因素约束。地铁隧道采用盾构法施工,具有较大的优越性。以合肥地铁5号线工程为例,进行复杂地质条件下地铁隧道盾构机选型与适应性分析。合肥地铁5号线隧道地质复杂,既有富水破碎岩层,又有高硬度和上软下硬特殊地层,极易出现喷涌、刀盘结泥饼等问题。通过盾构机选型与适应性分析,确保了工程顺利进行,对于类似工程具有参考价值。The construction condition of subway engineering is complex,constrained by urban building,pipeline water network,traffic environment and other factors.The shield method of subway tunnel has great advantages.Taking the Hefei Metro Line 5 project as an example,the selection and adaptability analysis of the shield machine of subway tunnel under complex geological condition were carried out.The tunnel of Hefei Metro Line 5 has a complex geology,including water-rich broken rock formation,as well as special strata with high hardness and upper soft and lower hardness,which is prone to problems such as gushing and cutterhead mud cake.Through the selection and adaptability analysis of the shield machine,the smooth progress of the project was ensured,and has reference value for similar projects.
分 类 号:U455.31[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49