高速公路隧道施工技术与质量控制分析  被引量:7

Analysis on Construction Technology and Quality Control of Expressway Tunnel

在线阅读下载全文

作  者:窦晨阳 DOU Chen-yang(China Communications Construction Jijiao Expressway Investment and Development Co.Ltd.,Tangshan 063000,China)

机构地区:[1]中交建冀交高速公路投资发展有限公司,河北唐山063000

出  处:《工程建设与设计》2023年第22期149-151,共3页Construction & Design for Engineering

摘  要:基于工程实例分析施工场地的地貌类型与水文地质条件,采用超前大管棚+超前小导管的组合方案实行隧道洞口段支护作业,围绕初期支护、喷锚混凝土、导坑开挖、仰拱施工与二次衬砌等施工工序,梳理基于CD法的现场开挖作业要点,并引入EVA泡沫减震材料与断面收敛、拱顶下沉监测等技术措施,完成施工质量验收。Based on engineering examples,the landform types and hydrogeological conditions of the construction site are analyzed,and the combined scheme of advanced large pipe shed and advanced small pipe is adopted to carry out the tunnel entrance support operation.Around the construction procedures such as initial support,shotcrete,pilot tunnel excavation,inverted arch construction and secondary lining,the key points of on-site excavation operation based on CD method are sorted out,and technologies such as EVA foam damping material,cross-section convergence and vault subsidence monitoring are introduced.

关 键 词:隧道施工 超前支护 CD法开挖 减震材料 质量控制 

分 类 号:U455[建筑科学—桥梁与隧道工程]

 