作 者:谢文祥 刘佳 李心荷 董杨 陈琛 XIE Wenxiang;LIU Jia;LI Xinhe;DONG Yang;CHEN Chen(Liaoning Pushihe Pumped Storage Co.,Ltd.,Dandong 118216,China;Cold Area Engineering Technology Research Center of Ministry of Water Resources of China Reclaimed Water Northeast Survey,Design and Research Co.,Ltd.,Changchun 130000,China;Cold Region Engineering Technology Research Center,Ministry of Water Resources,Changchun 130000,China)
机构地区:[1]辽宁蒲石河抽水蓄能有限公司,辽宁丹东118216 [2]中水东北勘测设计研究有限责任公司,长春130000 [3]水利部寒区工程技术研究中心,长春130000
出 处:《大电机技术》2024年第2期58-73,共16页Large Electric Machine and Hydraulic Turbine
摘 要:对蒲石河电站1号机组转轮进行国产化改造,改造后的水轮机组在压力脉动作用下对厂房共振及动力响应等进行计算。采用谐响应分析方法进行结构响应分析。根据模型试验得到的蜗壳和尾水管压力脉动幅值与主频,分别计算发电、抽水工况下蜗壳和尾水管压力脉动幅值和频率,并将蜗壳脉动分析结果和尾水管脉动分析结果进行叠加,得出发电、抽水工况下厂房结构在蜗壳压力脉动和尾水管压力脉动共同作用下的动力响应幅值。结果表明在压力脉动作用下,厂房结构动应力水平较低,远小于结构抗拉强度。厂房结构在抽水工况下的振动反应整体较小,而在发电工况下的振动反应整体较大,各结构部位的振动位移最大值、振动速度最大值、振动加速度最大值均满足预期。The runner of No.1 unit of Pushihe Hydropower Station is modified domestically,and the resonance and dynamic response of the plant under the action of fluctuating pressure are calculated.The harmonic response analysis method is used to analyze the structural response.According to the amplitude and main frequency of the fluctuating pressure of the volute and the draft tube obtained from the model test,the amplitude and frequency of the pressure fluctuation of the volute and the draft tube under the conditions of power generation and pumping are calculated respectively,and the results of the volute pulsation analysis and the results of the draft tube pulsation analysis are superimposed to obtain the dynamic response amplitude of the powerhouse structure under the combined action of the fluctuating pressure of the volute and the fluctuating pressure of the draft tube under the conditions of power generation and pumping.The results show that under the action of fluctuating water pressure,the dynamic stress level of the powerhouse structure is low,which is far less than the tensile strength of the structure.The vibration response of the plant structure under the pumping condition is small as a whole,while the vibration response under the power generation condition is large as a whole.The maximum vibration displacement,maximum vibration velocity and maximum vibration acceleration of each structural part meet the expectations.
关 键 词:蒲石河抽水蓄能水电站 厂房振动 水轮机压力脉动 动力响应 有限元分析
分 类 号:TM622[电气工程—电力系统及自动化] TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.176