出  处:《中国高新科技》2023年第20期55-56,61,共3页

摘  要:文章对长龙山抽水蓄能电站导流洞洞身混凝土衬砌施工技术进行研究分析,经实践论证后得出,该技术能高效完成圆形断面隧道洞身混凝土衬砌任务,施工质量及施工效率均达到了预期效果。该技术主要采用“针梁台车+人工立模”相结合的方式进行混凝土施工,可为类似工程提供借鉴。In this paper,the construction technology of concrete lining of diversion tunnel body of Changlongshan pumped storage power station is studied and analyzed.After practical demonstration,it is concluded that the technology can efficiently complete the concrete lining task of circular section tunnel body,and the construction quality and construction efficiency have reached the expected effect.This technology mainly adopts the combination of“needle beam trolley+manual mold”to carry out concrete construction,which can provide reference for similar projects.

关 键 词:圆形 隧道 混凝土 施工技术 

分 类 号:U455[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象