基于熵权物元可拓模型的海上风电项目后评价  被引量:1

On post evaluation of offshore wind power project based on entropy weight matter-element extension model

在线阅读下载全文

作  者:宿恺[1] 卢玉祥 邢作霞[2] 陈雷[2] SU Kai;LU Yuxiang;XING Zuoxia;CHEN Lei(School of Management,Shenyang University of Technology,Shenyang 110870,Liaoning,China;School of Electrical Engineering,Shenyang University of Technology,Shenyang 110870,Liaoning,China)

机构地区:[1]沈阳工业大学管理学院,辽宁沈阳110870 [2]沈阳工业大学电气工程学院,辽宁沈阳110870

出  处:《沈阳工业大学学报(社会科学版)》2023年第6期502-508,共7页Journal of Shenyang University of Technology(Social Sciences)

基  金:辽宁省科技厅重点研发项目(2019JH8/10100068)。

摘  要:近年来,我国海上风电项目迅猛发展,但由于其投资成本高,项目经过2年的生产运营期,后评价机构仍需对其建设运营过程中的数据进行统计和分析,进而发现问题并在总结经验的基础上提高项目收益。运用熵权物元可拓后评价模型,从项目财务、建设过程、技术3个维度解析海上风电项目投资建设状况,并使用Matlab软件分析出评价等级。研究结果表明,财务评价指标在海上风电项目后评价指标体系中权重最大,建设过程指标次之。通过逐级排查的方式查找出关联度较低的评价指标,并提出应对措施以反馈到未来的投资决策中。熵权物元可拓模型的评价结果与专家采用对比分析法所得出的结论一致,进一步验证了该评估模型的可行性与科学性。In recent years,the offshore wind power projects in China have developed rapidly.Due to its high investment cost,after two years of production and operation,the post evaluation organization still needs to make statistics and analysis on the data in the process of construction and operation,so as to find the problems and improve the project income on the basis of summarizing the experience.The post evaluation of the entropy weight matter-element extension model is used to analyze the investment and construction status of offshore wind power projects from the three dimensions of project finance,construction process and technology,and the evaluation grade is analyzed by Matlab software.The results show that the financial evaluation index has the largest weight in the post evaluation index system of offshore wind power project,followed by the construction process index.Through the step by step investigation,the lower evaluation index is found out,and measures to feed back are proposed to the future investment decisions.The evaluation results of entropy weight matter-element extension model are consistent with the conclusions obtained by the comparative analysis method adopted by experts,which further verifies the feasibility and scientific nature of the evaluation model.

关 键 词:海上风电项目 后评价 物元可拓模型 熵权法 评价指标 

分 类 号:F275.5[经济管理—企业管理]

 