检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张围围 ZHANG Weiwei(Guizhou Wujiang Hydropower Development Co,Ltd.,Guiyang 550002,China)
机构地区:[1]贵州乌江水电开发有限责任公司,贵州贵阳550002
出 处:《红水河》2023年第6期123-126,共4页Hongshui River
摘 要:乌江流域梯级水电站群面临着大量机组的检修需求,这涉及大量的维修任务和管理工作。为了制定一个全面、细致的检修全过程标准化流程,必须从顶层设计、人才培养、品牌建设等多维度入手,进行乌江干流梯级水电站群自主检修核心能力的构建。笔者分析了自主检修核心能力构建的必要性和发展思路,阐述自主检修核心能力构建的主要内容,可为流域水电站群自主检修规范化管理提供一定参考。The cascade hydropower stations in the Wujiang River Basin are faced with the maintenance requirements of a large number of units,which involves a large number of maintenance tasks and management work.In order to formulate a comprehensive and detailed standardized process for the whole process of maintenance,it is necessary to start from the top-level design,personnel training,brand building and other dimensions to build the core competence of self maintenance for cascade hydropower stations in the main stream of W ujiang River.The author analyzes the necessity and development ideas of the core competence construction of self maintenance,and expounds the main contents of the core competence construction of self maintenance,which can provide some reference for the standardized management of self maintenance for hydropower stations in the basin.
分 类 号:TV737[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.156.19