作  者:门小雄 任辉 郭保和 陈玉林 孙飞祥 MEN Xiaoxiong;REN Hui;GUO Baohe;CHEN Yulin;SUN Feixiang(Zhuhai Rail Transit Co.,Ltd.,Zhuhai Guangdong 519060,China;Big Shield Engineering Branch,China Railway Tunnel Bureau Group Co.,Ltd.,Zhengzhou Henan 450000,China;National Key Laboratory of Tunnel Boring Machine and Intelligent Operation and Maintenance,Zhengzhou Henan 450001,China)

机构地区:[1]珠海市轨道交通有限公司,广东珠海519060 [2]中铁隧道局集团有限公司大盾构工程分公司,河南郑州450000 [3]隧道掘进机及智能运维全国重点实验室,河南郑州450001

出  处:《交通节能与环保》2024年第1期222-226,共5页Transport Energy Conservation & Environmental Protection

摘  要:管片上浮控制是极软地层超大直径盾构隧道施工控制的关键难题。为了研究极软地层超大直径盾构隧道施工期管片上浮特征及其影响因素,本文依托珠海隧道工程,制定4种抗浮措施,比较分析了不同措施的抗浮效果,优选了抗浮措施。本文基于实测数据,研究管片上浮过程变化特征,揭示了施工期管片上浮变化规律;利用散点图进一步分析了管片错台量、掘进总推力、隧道埋深等因素与管片上浮量的相关性。Segment floating control is a key problem in the construction control of ultra-large diameter shield tunnel in extremely soft strata.In order to study the characteristics and influencing factors of segment buoyancy during the construction period of ultra-large diameter shield tunnel in extremely soft strata,four anti-buoyancy measures were formulated based on Zhuhai tunnel project,and the effects of different anti-buoyancy measures were compared and analyzed.Based on the measured data,the variation characteristics of segment floating process were studied,and the variation law of segment floating during construction period was revealed.The correlation between the number of displacements,the total thrust,the buried depth of the tunnel and the floating amount of the segment was further analyzed by using scatter diagram.

关 键 词:隧道工程 超大直径盾构 浅埋极软地层 上浮控制 因素分析 

分 类 号:U455.43[建筑科学—桥梁与隧道工程]

 