检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:盛峰 安雪晖[1] 林海香[3] 曾小清[4] 胡娜娜 李冬 包继锦 SHENG Feng;AN Xuehui;LIN Haixiang;ZENG Xiaoqing;HU Nana;LI Dong;BAO Jijin(School of Civil Engineering,Tsinghua University,Beijing 100084,China;Powerchina Roadbridge Group Co.,Ltd.,Beijing 100070,China;School of Automation and Electrical Engineering,Lanzhou Jiaotong University,Lanzhou 730070,China;Key Laboratory of Road and Traffic Engineering of the Ministry of Education,Tongji University,Shanghai 201804,China)
机构地区:[1]清华大学土木水利学院,北京100084 [2]中电建路桥集团有限公司,北京100070 [3]兰州交通大学自动化与电气工程学院,甘肃兰州730070 [4]同济大学道路与交通工程教育部重点实验室,上海201804
出 处:《同济大学学报(自然科学版)》2024年第2期184-191,共8页Journal of Tongji University:Natural Science
基 金:校企战略性合作专项高速铁路绿色智能施工关键技术研究(kh0160020230946、LQKY2022-01-1);国家自然科学基金重点项目(52038008)。
摘 要:在当前城市轨道交通快速发展的需求下,国内轨道交通安全相关系统的预评价方法尚不成熟,积累的各类故障、事故案例无法得到有效共享,导致实际工程中预评价工作难以开展。首先,构建了基于本体推理规则的Man(人员)、Machine(设备)、Media(环境)、Management(管理)及Mission(任务)的5M多因素信号系统安全知识库。其次,阐述信号系统预评估过程,结合案例分析和应用,形成了基于安全知识库的轨道交通安全预评价方法。最后,从风险辨识质量和风险控制精准度等多方面将基于安全知识库的轨道交通安全预评价方法与一般预评价方法进行比较,结果表明该方法能够从全生命周期角度对信号系统分阶段风险进行辨识并评定风险损失,风险辨识质量高、风险控制精准度高,且该方法的实施有利于加强城市轨道交通事前安全管理效果,同时也可为安全相关系统的风险预评价理论研究提供参考。With the rapid advancement of urban rail transit systems,the existing pre-evaluation practices for safety-related domains within domestic railway transport remain immature.The inability to share accrued cases of faults and accidents expedites the challenge in executing practical pre-evaluation tasks.First,a 5M(man,machine,media,management,and mission)multi-factor signal system security knowledge based on ontology reasoning rules is constructed.Then the pre-evaluation process of the signal system is elaborated.Evolving from case analysis and practical application,a novel rail transit safety pre-evaluation system is formed relying on a safety knowledge base.Finally,the rail transit safety preevaluation method based on safety knowledge base is compared with the general pre-evaluation method from the aspects of risk identification quality and risk control accuracy.The results verify that this approach can identify and appraise risk factors within signal system stages,spanning its complete lifecycle,with superior quality and precision in risk identification and control.The deployment of this methodology bolsters the strength of pre-safety management effectiveness in urban rail transit and provides a reference framework for theoretical investigations on risk pre-evaluation within safety-related domains.
关 键 词:轨道交通 信号系统 安全预评估 全生命周期 安全知识库
分 类 号:U284.95[交通运输工程—交通信息工程及控制]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38