检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:贺义雄 王燕炜 谢素美 HE Yixiong;WANG Yanwei;XIE Sumei(College of Economics&Management,Zhejiang Ocean University,Zhoushan 316022,China;Southern Marine Science and Engineering Guangdong Laboratory(Zhuhai),Zhuhai 519000,China;South China Sea Development Research Institute,Ministry of Natural Resources,Guangzhou 510310,China)
机构地区:[1]浙江海洋大学经济与管理学院,浙江舟山316022 [2]南方海洋科学与工程广东省实验室(珠海),广东珠海519000 [3]自然资源部南海发展研究院,广东广州510310
出 处:《海洋通报》2024年第2期248-264,共17页Marine Science Bulletin
基 金:国家自然科学基金(42006183);浙江省软科学研究计划(2023C35059);浙江省大学生科技创新活动计划暨新苗人才计划(2023R411053)。
摘 要:发展海洋碳汇对于建设人与自然和谐共生的美好世界具有重要意义,红树林作为海洋碳汇的重要来源,拥有强大的固碳和储碳能力,具有较高的生态价值和经济价值,因此,加快开发红树林碳汇是应对气候变化的重要战略选择。本文基于三角模糊数和结构方程构建红树林碳汇项目风险测度模型,选取湛江红树林造林项目这一我国的代表性项目,采用净现值方法和肯定当量法对其进行实证对比分析,测度风险因素对项目价值及其投资决策的影响,从而助力红树林碳汇的高质量发展。结果表明:(1)红树林碳汇项目的开发存在一定的风险,各阶段风险按照影响由高到低,依次为核查备案阶段、决策阶段、施工阶段、运营维护阶段和设计阶段,核查备案阶段的技术风险、决策阶段的政策风险、施工阶段的市场风险、运营维护阶段的市场风险和设计阶段的人类行为风险是各阶段中影响较大的风险种类;(2)风险的发生会使红树林碳汇项目的价值降低,相比传统净现值法,肯定当量法更符合红树林碳汇项目的开发和运行情况。Accelerating the development of marine carbon sink for the construction of the harmonious development of human and nature beautiful world is of great significance.Mangrove as an important source of marine carbon sink,because of its strong carbon sequestration and carbon storage capacity,has high ecological value and economic value.Speeding up the development of mangrove carbon sink is an important strategic choice for addressing climate change.Based on the triangular fuzzy number and structural equation,this paper constructs the risk measurement model of the mangrove carbon sink project,selects Zhanjiang mangrove afforestation project as a representative project in China,and uses the net present value method and the positive equivalent method to conduct empirical comparative analysis to measure the impact of risk factors on project value and investment decision-making,so as to help the high-quality development of the mangrove carbon sink.The results show that:(1)There are certain risks in the development of mangrove carbon sink projects.The risks in each stage,from high to low,are verification and filing stage,decision-making stage,construction stage,operation and maintenance stage and design stage.The technical risk at the verification and filing stage,the policy risk at the decision-making stage,the market risk at the construction stage,the market risk at the operation and maintenance stage and the human behavior risk at the design stage are the types of risks with great influence in each stage.(2)The occurrence of risks will reduce the values of mangrove carbon sink projects.Compared with the traditional net present value method,the positive equivalent method is more consistent with the development and operation of mangrove carbon sink projects.
关 键 词:红树林碳汇项目 风险测度与评价 供给主体 全生命周期
分 类 号:P748[天文地球—海洋科学] X22[环境科学与工程—环境科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.170