摘  要:为了提升高速铁路隧道施工技术,总结了大断面浅埋隧道的判定方法,并以某铁路隧道为研究对象,利用MIDAS软件建立计算模型,对比了台阶法、留核心土法、CD法、双侧壁法的加固效果,并从隧道进洞、超前支护、塌方处治等方面探讨了大断面浅埋隧道的施工要点。同时,以双侧壁导坑法为例,计算了不同开挖高度和开挖面距离下隧道围岩的变形。In order to improve the construction technology of high-speed railway tunnels,the judgment methods of large section shallow buried tunnels were summarized.A calculation model was established by using MIDAS software for a certain railway tunnel,and the reinforcement effects of step method,circular excavation with core soil method,CD method,and double-sided wall method were compared.The construction points of large section shallow buried tunnels were discussed from the aspects of tunnel entry,advance support,and landslide treatment.At the same time,taking the double-sided heading method as an example,the deformation of tunnel surrounding rock under different excavation heights and excavation surface distances was calculated.

关 键 词:大断面 浅埋隧道 施工要点 塌方处治 施工参数 

分 类 号:U455[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象