作 者:李泽钿 LI Ze-dian(Xiamen Engineering Co.Ltd.ofChina First Highway Engineering Co.Ltd.,Xiamen 361000,China)
机构地区:[1]中交一公局厦门工程有限公司,福建厦门361000
出 处:《工程建设与设计》2024年第6期106-108,共3页Construction & Design for Engineering
摘 要:为了提升高速铁路隧道施工技术,总结了大断面浅埋隧道的判定方法,并以某铁路隧道为研究对象,利用MIDAS软件建立计算模型,对比了台阶法、留核心土法、CD法、双侧壁法的加固效果,并从隧道进洞、超前支护、塌方处治等方面探讨了大断面浅埋隧道的施工要点。同时,以双侧壁导坑法为例,计算了不同开挖高度和开挖面距离下隧道围岩的变形。In order to improve the construction technology of high-speed railway tunnels,the judgment methods of large section shallow buried tunnels were summarized.A calculation model was established by using MIDAS software for a certain railway tunnel,and the reinforcement effects of step method,circular excavation with core soil method,CD method,and double-sided wall method were compared.The construction points of large section shallow buried tunnels were discussed from the aspects of tunnel entry,advance support,and landslide treatment.At the same time,taking the double-sided heading method as an example,the deformation of tunnel surrounding rock under different excavation heights and excavation surface distances was calculated.
分 类 号:U455[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33