检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李俊梅 LI Jun-mei(Xi'an Aerospace Shenzhou Architectural Design Institute Co.Ltd.,Beijing Branch,Beijing 100043,China)
机构地区:[1]航天科技集团西安航天神舟建筑设计院有限公司北京分公司,北京100043
出 处:《工程建设与设计》2024年第7期255-257,共3页Construction & Design for Engineering
摘 要:阐述建筑师负责制与EPC工程总承包相结合的意义,以中航商发上海某产业园项目为例,对该项目中建筑师负责制与EPC工程总承包相结合的实践策略进行探究,主要从做好设计统筹与规划管理及完善过程设计与监造管理两方面进行具体分析。This paper expounds the significance ofcombining architect responsibility system with EPC project general contracting,and takes an industrial park project of AECC Shanghai as an example to explore the practical strategy of combining architect responsibility system with EPC project general contracting in this project,mainly from do design overall planning and planning management;specific analysis on the improvement of process design and supervision management.
分 类 号:F426[经济管理—产业经济] TU201[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.69